Sunday, 29 June 2014

Rebel Runner is a Ship, and a quieter one too.

A couple of things to report. Firstly, Rebel Runner is officially a ship! The certificate from the Register of British Ships Part III arrived today, not much - just a laminated A6 card - but she has a number and I will have to get it made up to stick on the side.

The other bit of progress was completing the new gutter on the old engine casing. The previous one was placed under the hinge crack to prevent water dripping onto the engine which worked fine until you opened the lid, when all the water ran onto the engine because the gutter was not wide enough. I cut the old one off and found it was just a piece of poly pipe laminated over. With much advice from Garry I used an old bed slat as a mould and laminated three layers of mat onto it. After it cured I popped it out, trimmed it up and bonded it in place with paste. I then put another three layers on. Trimmed again, filled various gaps and flo coated over. I also filled surplus screw holes and gel coat chips while I was about it. Sounds very cool and easy? No so. Garry will know, he had loads of texts and questions including when the parcel tape used to release the mould went all wrinkly and the result was a mess which needed much filling and sanding. Garry would have done it in minutes, I took half a day plus several evenings but here is the result.


I took the engine casing back to the boat on Sunday, and trial fitted. As suspected, the extra layers of mat did make it jam when I tried to slot it in but a bit of grinding out fixed it. All polished:





Next job was to fit the soundproofing mat I had bought on a special offer way back. One and a half sheets did the lid, and the three sides consumed most of two more. I finished the edges off with metal tape. You are supposed to use it for joining two sheets but I had plenty and it finished it off rather well.



The engine started first turn as usual, it is still a growler but what do you expect for 260HP. I have done all I could. I took Rebel Runner out for a quick spin round the harbour entrance but no mackerel were evident so still no fish guts on that deck I'm afraid. Final job was to rub down and polish some gel coat patches on the roof then she was all tucked up ready for next time.

P.S.

This is what it looked like when I bought it.













Posted by Neville Merritt at 15:05 No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Monday, 23 June 2014

New decking in the cockpit

Saturday -today's job was to fit the Permateek deck (if only to stop Garry nagging me about it!) Actually I'm just as keen to see it finished as he is. I started off with a visit to Garry to collect the empty drums he promised, to use as weights. He also cut me some mat to use to make new gutter in the engine box. Then off to the marina via BaseLine Marine to buy two catches for the electronics hatch (another job in progress). I eventually arrived at the marina, where it was dead calm and baking hot. Calm good, baking hot - not so good if the glue goes off! Anyway, on to work.

First take off the engine casing and wrap the engine up. Then sand down the deck, take off any lumps and bumps, and screw down an access plate that I am going to cover up. I measured carefully and recorded it in the back of the Log Book so I know where it is if I ever have to cut a hole. Then I had to do a thorough clean, and make any slight adjustments to the Permateek mats to make sure they fitted like a glove. There would be no second chances. The glue was in sausages so I had to invest in a sausage gun, expensive but worth it. After all that, each panel took about half an hour to fit, what with the gluing, spreading, fitting and rolling out. I weighted them down with wooden boards, Garry's drums and more buckets. The boat looked like it was about to make a drought relief trip up some African river. I took the engine casing home and tomorrow I'll make a start on the GRP work before going back tomorrow afternoon to see what the new deck looks like.


Sunday -part 2 of the decking installation. I spent the afternoon glassing up a new gutter in the engine casing, with real-time virtual help from Garry with text messages. I'll show photos when I have tidied it up, but it looks pretty good for a beginner. This evening I went back to the marina to see how the deck had stuck down. All the planks and Garry's drums seem to have worked. I emptied everything out, then spent ages masking all around the edges of each panel to caulk the gaps and ensure any water drains to the scuppers and doesn't settle and go green. The engine casing is still at home but here are a few shots of the new deck. Looks good.





Posted by Neville Merritt at 12:42 5 comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Tuesday, 17 June 2014

Father's Day Photo-shoot

Father's Day today, so we made it a family occasion on Rebel Runner with a lunch on board. First however, I persuaded daughter Aedy and wife Olwyn to take a walk to the pier at the entrance to Langstone Harbour so Aedy could take some photos of Rebel Runner showing her paces. She did a great job with her pro camera, a selection reproduced here. Then we had a very pleasant lunch (a table! Seating!! Sink and Cooker!!!) So civilized. After lunch I went and collected a very important package from the marina office, but here are the action shots first:



That very important parcel was my Permateek decking and I must say Mike has done a brilliant job. Here is the hatch section just laid down for a preview


The side sections are all rolled up, I can't lay them until the engine casing is trimmed




A couple more:








Posted by Neville Merritt at 14:02 2 comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Sunday, 8 June 2014

More things working now...

I only had a morning in the marina this weekend so I had to make it count. The weather was stunning, although probably a tad breezy further out (or so I told myself). First job was to make the fuel gauge work. I had ordered a new sender from A.s.a.p Supplies which arrived within a day as usual. I wired it up and slid the slidey thing up and down. The needle waved back at me so that looks alright. It was then a simple matter of undoing five screws, lifting the old sender out, dropping the new sender in, aligning the holes (note to others - for some reason the holes are not equally spaced so don't start screwing until you know holes and gasket are aligned) and tightening up. Re-do all the connections and we are back in business with a working gauge.

Next job was a bit more daunting and another one I had been procrastinating - drilling out the old sink drain to take the Webasto heater exhaust skin fitting. It was on the water side of the boat, not the pontoon but luckily there was nobody in the berth next to me so with a series of long warps and running back and forth I moved Rebel Runner about three metres right and tied up again.


 
I had to be very careful about getting in and out, it would have been so easy to leap onto the port side to get out as I usually do, except that would have resulted in a bath.
The old skin fitting came off very easily, no problems there. Now I had to drill a 40mm hole on the same place, at an acute angle to match the angle of the pipe inside the skin fitting. There was no room inside so I have to hang over the side of the pontoon and drill up into the hull with a 240volt device in my hands inches above the water. Luckily the Elf and Safety Department was still tucked up in bed. All went well however, then I had to align the fitting in the hole while I drilled for the mounting screws.

I still have a vivid memory of sitting on the roof while an expensive 316 bolt went bounce bounce bounce plunk into the water. If I slipped, this skin fitting wasn't even going to do the bounce bit, just a straight plunk. I set up a contraption of cord so it could run up and down without falling in, which meant all I had to worry about was dropping drill, chuck key, mastic, screws, screwdriver and power cable. With dextrous fiddling and use of masking tape to hold things in place, one by one the screws were installed and tightened up. It would have been a lot easier with another pair of hands, but where's the challenge in that?



The exhaust pipe was trimmed, lagged and clamped up to the skin fitting and we were nearly ready. Last job was to get fresh air from outside. The space under the side decks ends at the bulkhead, and the other side of the bulkhead is an open rope locker so that was the ideal place to put a vent and duct connector. When they design factory boats I bet they think these things through first. That 80mm hole would have taken moments to do while the bulkhead was lying on a bench, instead it was now in a place where virtually no power tools could reach. With a bit of this and a bit of that and at least half an hour of grunting I managed to carve a not very neat hole but as it is under the vent face nobody will see.




The final job was to put the fuse back in, turn the heater control to Full, and see what happened. These days, machines can sort them selves out so after what seemed like minutes of glugging, whirring and blowing, she very quietly throbbed into life and blew nice hot air around the cabin. I won't be needing it just yet but it is a relief to know it all works.

Posted by Neville Merritt at 13:50 No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Thursday, 5 June 2014

Fitting and Fishing

This Saturday promised to be sunny and settled. Time for a bit of fishing, although I had a few jobs to do first. The management decided she wanted a new Turtlemat doormat for the house. I sneaked an order in for a marine one at the same time. Wipe your feet!



I have long promised new decking in the cockpit, but it has taken a while to happen. I phoned the Permateek man who was supposed to be taking the template and found he was running behind, work-wise (what's new?). He kindly sent me a pack of templating material so I could mark up the deck area and move things along a bit. With Mike's instructions this was surprisingly easy, I guess it wouldn't have been if has been in any way wet or windy! The material was as see-through as tracing paper but strong, more like a man-made fabric. Hopefully the panels can now be made up and I'll have a go at fitting.



Next job was investigating why the fuel tank sender wasn't working. I measured up for a new one, as it is a sealed unit and there is nothing that can be repaired.

Another quick repair job, to replace the shore-power socket and then the marina traffic lights went green and we could go to sea. I headed out after that, hoping for bream. Rebel Runner cruised easily at 20 knots and took me to Bullocks Patch. One thing I hadn't shown before - I designed the mast to have a halliard point for a pennant or anchor ball. Worked well.


The Harley 25 has a very stable hull at anchor, much better than the Trophy on a beam wind as we had on Saturday. Actually it was very comfortable, great for having a brew in the galley, and washing up after too! After a pollack, some nice smoothhound and numerous pouting, it looked like the bream weren't playing so I headed back to Hayling Bay. First drop, a bream. second drop, a smoothhound, then nothing so I headed in just before the gate closed. I still haven't got used to the handling so I made another mess of getting into the finger berth, but not as badly as before so at least there is some improvement
Posted by Neville Merritt at 13:50 No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Monday, 26 May 2014

More work, more progress.

Another weekend, another day of graft. The weather wasn't kind on Monday so I spent most of the time inside while the rain drummed on the roof. Nice and cosy now though. First job was to fit the footrest, an inspired idea from this forum. Folded away neatly:


And deployed for use:




Then I stuck my head under the crew seat and finished off all the wiring and venting for the Webasto heater. There are only two tasks left: fitting the exhaust skin fitting and the fresh air intake. Both outside jobs, and driving rain is not required.



When the boat arrived it had a Navico multi function display with through hull transponder, speed, temperature and timing features. It was removed to make way for the Garmin set-up. I decided why waste it, it has useful features and could always be a back-up. I took the cup-holder off and installed it in its place. That should have been simple, but behind that bulkhead was the black box sounder which had to be moved, and I had run out of fuse spaces. So I had to put in a new fuse block and another ground bus-bar, but that would come in useful later.




My Icom handheld VHF came with a charging base, and it makes a secure holding-place. I screwed it to the side shelf and routed the charging cable back to the electrics behind the bulkhead, making a permanent fixture.



And then...the rain eased off! Time for a quick outside job before home. I had bought two sets of rod holders which were fitted at the stern. Did I mention I love this work so much I do it twice? First time round the rod holders were fitted upside down. Lucky I noticed before looking at the photo! You can also see the life belt and holder fitted previously.



The next major job will be lining out the cabin. Watch this space


Posted by Neville Merritt at 13:33 No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Sunday, 18 May 2014

First trip after the re-fit

Today was sea trials day, but I had a couple of jobs to do first. I must like fitting out boats so much I do jobs twice. This one was refitting the table, as first time round it was a bit bendy so it was taken back to my workshop for some beefing up. That was successfully refitted. I also finished the galley cupboard with the last bit of ply painted and in place. I had a few minutes left before the marina gate opened so I cut some anti slip matting to fit the table and various other places. This shot of the helm also shows the teak boss I made for the wheel, and the Garmin Downvu in place.


It was time for sea. I started the engine, and moved out to the fuel berth to take on 160 litres. I was very relieved to see that the Webasco fuel pipe hole I had cut did not leak a drop. I headed out for a bit of fishing, the weather was perfect, plenty of sun and a gentle breeze. There were also a few ships about so I could try going through their wash. Nothing broke! Steady as a rock. The water was still a bit coloured so I wasn't too hopeful. However, the first spot produced smoothhound and pouting. It went quiet so I moved to another mark, partly to get used to the Alderney method with a different boat. Here is a photo for Garry, the bowsprit behaved perfectly. One thing I did notice is the gap in the rail over the bowsprit is exactly me-sized so I shall have to watch I don't take a dive when detaching the ring. I did have a worrying moment though, the engine wouldn't start! I tracked it down to a stuck stop solenoid which had not slackened off, a quick prod and we were back in business.



Here are the Railblaizas at work




and me watching them. By the way I treated myself to a new Spinlock life jacket, very comfortable and an excellent spec.



The table makes an excellent rig station.


Before long I had to head back in because I had a date. My wife brought food down so we could have a first meal on board. What a star!




It was a perfect evening, warm and still and after the meal we had coffee in the cockpit watching the mullet, including a monster. All that work finally seemed worth it.

Now for Phase 2
Posted by Neville Merritt at 14:44 No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

About Me

My photo
Neville Merritt
My blogs contain thoughts, ideas and comments that haven't made it to my hobby site www.boat-angling.co.uk
View my complete profile

Blog Archive

  • ▼  2021 (1)
    • ▼  October (1)
      • Neutral Indicator
  • ►  2020 (1)
    • ►  July (1)
  • ►  2018 (1)
    • ►  May (1)
  • ►  2015 (8)
    • ►  December (2)
    • ►  September (1)
    • ►  July (1)
    • ►  May (1)
    • ►  April (1)
    • ►  March (1)
    • ►  January (1)
  • ►  2014 (48)
    • ►  October (1)
    • ►  September (3)
    • ►  August (3)
    • ►  June (5)
    • ►  May (2)
    • ►  April (6)
    • ►  March (4)
    • ►  February (7)
    • ►  January (17)
Watermark theme. Powered by Blogger.