He has done a lot more ripping out and suddenly lots more space has appeared. The galley is in, and so is the side moulding. Cables are re-routed and ready to be connected up.
Sunday, 26 January 2014
At Last
At last, a report of things coming together. I had boxed up the mouldings Garry made and after work today I carried them onto the Red Jet to Cowes. Yes I had a lot of funny looks but who cares, £14.60 return instead of £60 at least by car. Nigel met me, right at the gangplank bless him, and helped me carry them to his van. We went to the yard to inspect progress and see what fitted.
He has done a lot more ripping out and suddenly lots more space has appeared. The galley is in, and so is the side moulding. Cables are re-routed and ready to be connected up.
and the cockpit seat locker
A last look back into the wheelhouse then away back on the Red Jet and home.
He has done a lot more ripping out and suddenly lots more space has appeared. The galley is in, and so is the side moulding. Cables are re-routed and ready to be connected up.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment